Total amount
5.9 millones de pesos mexicanos (5,941,595.34 MXN)
Contract period(s)
Between 30 de septiembre de 2009 and Fecha desconocidaThis contract is part of a record. See record ocds-0ud2q6-16101042-074-09 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
This contract has not been evaluated.
Call title
Construccion del muro y bordo de proteccion colonia Indeco tramo III
Award title
CONSTRUCCION DE BORDO DE PROTECCION EN VILLA CHABLE
Contract title
CONSTRUCCION DE BORDO DE PROTECCION EN VILLA CHABLE
Amount
5.9 millones de pesos mexicanos (5,941,595.34 MXN)
Signature date
30 de septiembre de 2009
Execution period
30 de septiembre de 2009 to Fecha desconocida
Internal award code
SGIHOCFSTAB09TT140RF
No data
Date updated in QQW
9 de mayo de 2021
Source(s)
Part of the project
Organization responsible for the import