Total amount
856,722.4 pesos mexicanos
Contract period(s)
Between 17 de abril de 2009 and Fecha desconocidaThis contract is part of a record. See record ocds-0ud2q6-16101042-020-09 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
This contract has not been evaluated.
Call title
Supervision de construccion de rectificacion del Arroyo Granaditas
Award title
ESTUDIO Y PROYECTO EJECUTIVO PARA LIMPIEZA Y DESAZOLVE DEL DREN EL CHININ
Contract title
ESTUDIO Y PROYECTO EJECUTIVO PARA LIMPIEZA Y DESAZOLVE DEL DREN EL CHININ
Supplier(s)
Amount
856,722.4 pesos mexicanos
Signature date
17 de abril de 2009
Execution period
17 de abril de 2009 to Fecha desconocida
Internal award code
SGIHOCFSTAB09TT084RF
No data
Date updated in QQW
9 de mayo de 2021
Source(s)
Part of the project
Organization responsible for the import