Total amount
4.2 millones de pesos mexicanos (4,211,710.64 MXN)
Contract period(s)
Between 3 de julio de 2012 and Fecha desconocidaThis contract is part of a record. See record ocds-0ud2q6-16101042-018-10 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
This contract has not been evaluated.
Call title
Rehabilitacion de la segunda etapa del camino del puente del colector B al ejido Zanapa seccion El Tumbo en el DTT 002 Zanapa Tonala
Award title
Rehabilitacion de la segunda etapa del camino del puente del colector B al ejido Zanapa seccion El Tumbo en el DTT 002 Zanapa Tonala
Contract title
Rehabilitacion de la segunda etapa del camino del puente del colector B al ejido Zanapa seccion El Tumbo en el DTT 002 Zanapa Tonala
Supplier(s)
Amount
4.2 millones de pesos mexicanos (4,211,710.64 MXN)
Signature date
3 de julio de 2012
Execution period
3 de julio de 2012 to Fecha desconocida
Internal award code
SGIHOCFSTAB10TT079RF
No data
Date updated in QQW
9 de mayo de 2021
Source(s)
Part of the project
Organization responsible for the import