Total amount
13.2 millones de pesos mexicanos (13,239,729.55 MXN)
Contract period(s)
Between 16 de febrero de 2011 and 27 de diciembre de 2012This contract is part of a record. See record ocds-0ud2q6-1-R-CB-A-515-W-0-1 in Open Contracting Data Standard format.
More than 20 algorithmic tests are run at the contract level, grouped into four categories, to determine the quality of procurement data. The methodology can be consulted here.
This contract has not been evaluated.
Call status
complete
Call title
CONSERVACIÓN RUTINARIA BIANUAL 2011-2012 ZONA 6 DEL KM 36 000 AL 70 600 DEL KM 73 800 AL 137 000 DE LA CARRETERA TEPIC-PUERTO VALLARTA TRAMO: TEPIC-LIM EDOS NAY/JAL DEL KM 0 000 AL 2 100 RAMAL A LOS AYALA DEL KM 0 000 AL 1 520 DEL SUBRAMAL LO DE MARCOS LAS MINITAS DEL KM 2 440 AL 19 685 DEL RAMAL A PUNTA DE MITA DE LA CARRETERA: TEPIC-PUERTO VALLARTA TRAMO: TEPIC-LIM EDOS NAY/JAL
Award title
CONSERVACIÓN RUTINARIA BIANUAL 2011-2012 ZONA 6 DEL KM 36 000 AL 70 600 DEL KM 73 800 AL 137 000 DE LA CARRETERA TEPIC-PUERTO VALLARTA TRAMO: TEPIC-LIM EDOS NAY/JAL DEL KM 0 000 AL 2 100 RAMAL A LOS AYALA DEL KM 0 000 AL 1 520 DEL SUBRAMAL LO DE MARCOS LAS MINITAS DEL KM 2 440 AL 19 685 DEL RAMAL A PUNTA DE MITA DE LA CARRETERA: TEPIC-PUERTO VALLARTA TRAMO: TEPIC-LIM EDOS NAY/JAL
Contract title
CONSERVACIÓN RUTINARIA BIANUAL 2011-2012 ZONA 6 DEL KM 36 000 AL 70 600 DEL KM 73 800 AL 137 000 DE LA CARRETERA TEPIC-PUERTO VALLARTA TRAMO: TEPIC-LIM EDOS NAY/JAL DEL KM 0 000 AL 2 100 RAMAL A LOS AYALA DEL KM 0 000 AL 1 520 DEL SUBRAMAL LO DE MARCOS LAS MINITAS DEL KM 2 440 AL 19 685 DEL RAMAL A PUNTA DE MITA DE LA CARRETERA: TEPIC-PUERTO VALLARTA TRAMO: TEPIC-LIM EDOS NAY/JAL
Amount
13.2 millones de pesos mexicanos (13,239,729.55 MXN)
Signature date
10 de febrero de 2011
Execution period
16 de febrero de 2011 to 27 de diciembre de 2012
Internal award code
1-R-CB-A-515-W-0-1
No data
Date updated in QQW
9 de mayo de 2021
Part of the project
Organization responsible for the import